New Pot Lights New LED pot lights installed. Run new wiring connect and clean, once done
Rough-in Basement Plumbing Rough in plumbing for legal basement apartments
Install New Basement Windows Cut, dig and install new basement windows
Pot Lights under 10 New LED pot lights installed. Run new wiring connect and clean, once done
Mold Cleaning Bleach and water soultion to remove any surface mold that maybe present.
Room & Furniture Protection Room & Furniture Protection. Move furniture where need to install floors
Natural Stone Natural stone detail and cover
Drywall & Taping New drywall supply and install. Tape to level 3-4 and get ready for paint. To get level 5 in some areas at an extra cost. Recommended for entrances,open to above and bright areas.
We’ll create a template that fits your needs, includingconverting your Excel sheets and integrating with your takeoff software.